USS Virgil :: Tour - Main Engineering

Tour - Main Engineering

« Back to Tour Items

Summary

The main engineering area.

Additional Information

Location Deck 1 & 2
Description Main engineering on the Defiant-class is situated on Deck 1 with the lower section on deck 2. The Master Situation Monitor is located in the starboard wall bulkhead. The warp core is placed on an elevated platform in the center of the room opposite the control consoles.